The complete drawing + data foundation · all 5 layers, delivered together.
P&ID, isometrics, single-line diagrams, general arrangement, asset register · all verified, all consistent, all delivered together as one Brownfield Digital Engineering package. The geometric, schematic, electrical, spatial, and asset layers of your digital twin · in one engagement.
Historically, plants procure as-built work in silos · P&ID update from one contractor, isometric generation from another, SLD from a third. The result is overlapping scopes, drawing inconsistencies, and three handovers that don't tie together. The full as-built package is one engagement, one LiDAR foundation, one verification walkdown, five consistent drawing layers, one digital twin handover. Plants in our roster have used this pattern to cut as-built costs by 30-40% and timeline by 50% vs the unbundled approach.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the As-Built Engineering practice lead within 24 hours.
LiDAR scan + survey control across the in-scope area. One scan, all 5 deliverables built from it.
One walkdown verifies P&ID line connectivity, isometric extraction, SLD cable tags, GA equipment layout, asset register tag plates. Less time, fewer permits, better consistency.
P&ID + isometric + SLD + GA drawn in parallel by discipline-specific teams · all referencing the same scan + verification source.
Every link verified · P&ID line tag matches isometric line list, SLD bus tag matches asset register, equipment tag identical in GA + P&ID + asset register.
All 5 deliverables packaged together. Native formats. Digital twin platform handover (Wistwin / AVEVA / Bentley / Hexagon).
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three anonymised engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
Crude Distillation Unit · all 5 deliverables in one 18-week engagement. 30% saving vs prior unbundled approach. Digital twin handover to Wistwin.
Cleanroom + utility complete as-built. GMP validation evidence chain built in. FDA pre-approval ready.
Full as-built across 3 process units · foundation for AVEVA digital twin. 14-month digital twin programme accelerated to 9 months.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.