Process hazard analysis (HAZOP / LOPA per IEC 61882). Functional safety verification (SIL per IEC 61511). Quantitative Risk Assessment. Arc Flash AMC with 5-year recertification retainer per NFPA 70E + IEEE 1584. Same-day callback for compliance deadlines.
VB Engineering delivers Risk + Safety + Arc Flash AMC from Hyderabad HQ + Houston/Katy practice teams. HAZOP + LOPA per IEC 61882 + 61511 Part 3. SIL assessments per IEC 61511. Quantitative Risk Assessment with consequence modelling + ALARP demonstration. 5-year Arc Flash AMC retainer per NFPA 70E + IEEE 1584. Country-native overlays · ADNOC SAES + Aramco SAES + UAE Fire Code + AS/NZS 4801 + SS 506 + K3 Migas + HSE 1989 + GB Standards. Every deliverable named Chartered Engineer signed.
Risk + Safety + Arc Flash AMC discipline · across 21 countries · CEng MIE signed.
Risk + Safety + Arc Flash AMC runs the international standards stack with country-native regulatory overlays applied per jurisdiction.
Hazard and operability study guide. Applied across refineries, petrochem, pharma, and steel plants. PESO + DGFASLI + OSHA + ADNOC SAES overlays.
Functional safety for the process industry SIS. LOPA-supported SIL target verification. ISA TR84 reference framework. Cross-walked for jurisdiction-specific deliverables.
Standard for Electrical Safety in the Workplace + Guide for Performing Arc Flash Hazard Calculations. Applied on every Arc Flash AMC retainer.
OSHA Process Safety Management + EPA Risk Management Program. Applied across US refineries + petrochem + chemical. Cross-walked with PESO + ADNOC + DGFASLI.
API building siting + portable buildings + risk-based inspection. Cross-walked with ALARP demonstration for international deliverables.
Chartered Engineer + Professional Engineer signature accepted across India, US, GCC, AU, SEA, UK jurisdictions. Practice Lead direct sign-off on 5-year AMC retainers.
The Risk + Safety + Arc Flash AMC discipline broken into distinct deliverables. Productized for repeatability across 21-country footprint.
IEC 61882 hazard and operability studies. Process plant + refinery + petrochem + pharma applicable. Multilingual node tracking where required. PESO / OSHA / ADNOC SAES overlays.
IEC 61511 functional safety verification on SIS architectures. LOPA-supported SIL target verification. ISA TR84 reference framework. PFD avg + risk reduction factor verification.
Quantitative Risk Assessment. Frequency analysis + consequence modelling + ALARP demonstration. EPA RMP 40 CFR 68 + API RP 752 + 753 + 581 cross-walked.
IEC 61511 Part 3 facilitated LOPA workshops. Independent Protection Layer (IPL) credit verification. OSHA PSM + ADNOC SAES vendor approval compatible.
NFPA 70E + IEEE 1584 5-year recertification retainer. Year 1 initial study + Years 2-5 quarterly site walk-throughs + annual study refresh + signage refresh. CEng / PE signed annual.
Real engagements from the Risk + Safety + Arc Flash AMC practice · F500 anchor accounts · CEng / PE signed.
HAZOP refresh on FCC + Crude + Coker + Hydrotreater units. NFPA 70E + IEEE 1584 arc flash study locked into a 5-year AMC retainer. OSHA 1910.119 PSM aligned. PE Texas + CEng dual signature.
Plant-wide HAZOP. SIL assessment on the SIS architecture. QRA on ammonia + oxygen storage. ALARP demonstration. DGFASLI factory inspection compatible. CEng MIE FIE signature.
HAZOP refresh on FCC unit + adjacent process blocks. SIL assessment on 12 safety functions. ADNOC SAES vendor approval framework. Arabic-English bilingual node tracking. CEng UAE-licensed signature.
Country-native Risk + Safety + Arc Flash AMC pages with jurisdiction-specific standards, regulators, and case studies. Pick your geography.
Primary: IEC 61511 (SIL), IEC 61882 (HAZOP / LOPA), NFPA 70E + IEEE 1584 (Arc Flash). Regulatory overlays: OSHA 1910.119 + EPA RMP for US; ADNOC SAES + UAE Fire Code for UAE; Aramco SAES + SCE for KSA; Qatar Energy + KAHRAMAA for Qatar; AS/NZS + AusIMM for AU; SS 506 for Singapore; PUIL 2011 + K3 Migas for Indonesia; HSE 1989 + COMAH for UK; GB Standards for China; PESO + DGFASLI + CEA + BIS for India.
Initial NFPA 70E + IEEE 1584 study delivered Year 1. Quarterly site walk-throughs in Years 2-5. Annual study refresh + signage refresh. Coverage of new equipment additions. Country-native overlays applied. CEng / PE signed every annual refresh. Tier 1 priority routing for AMC-flagged engagements.
Same-day callback for compliance-deadline-driven enquiries. Within 24 hours a named CEng MIE or PE Texas is on the line. 45-minute discovery call. Joint scoping document within 72 hours. Full engineering proposal within 7 calendar days.
Yes. Arabic-English bilingual where required (UAE, KSA, Qatar). Mandarin Chinese-English (China). Bahasa Indonesia-English (Indonesia). Hindi-English (India where requested). Other languages on request.
Risk + Safety engagements often bundle with PSS Arc Flash on the same plant · single engagement, single Principal Reviewer signature. Native handover to Wistwin · the sister Industry 4.0 platform · for safety case digital archival + continuous monitoring.
Tell us what you need · a named Chartered Engineer responds within 24 hours.
Process safety, electrical safety and a 5-year AMC retainer under one practice. HAZOP chair, QRA modelling in PHAST + Safeti, LOPA + SIL determination to IEC 61511, arc flash hazard analysis to NFPA 70E (2024) + IS 13234, OISD + PESO + OSHA PSM + Factories Act safety audits. Hyderabad HQ chairs the HAZOP, Houston Operations services US OSHA PSM and Process Hazard Analysis renewals.
Eight programs spanning process safety, electrical safety and the long-tail 5-year AMC retainer. Every deliverable signed off by a staff Chartered Engineer or PE before client release. Audit-ready for OISD, PESO, OSHA PSM and Factories Act regimes.
HAZOP chair + scribe + node lead. IEC 61882 methodology. OISD-118 / OSHA PSM compliant.
Quantitative Risk Assessment in PHAST + Safeti. Dispersion, flammable, toxic, BLEVE.
Layer of Protection Analysis. SIL determination to IEC 61511 / 61508. SIF design review.
IEEE 1584-2018 + NFPA 70E (2024) + IS 13234. Hazard labels printed and installed.
OISD / PESO / OSHA / Factories Act statutory safety audits. Gap analysis and closure plan.
PSSR chair for greenfield + brownfield. Punch list ownership through to MoC closure.
Emergency Response Plan, on-site / off-site, drill calendar. NDMA + EPA + OISD-153 aligned.
Annual HAZOP refresh, arc flash update, SIL recertification, audit support, retained Chartered Engineer.
Service Hubs are country-neutral. Deliverables stamped to the standard that the receiving plant operates under, drawn from the international technical core, Indian statutory + BIS, and US codes.
Marquee discipline: VB Engineering markets only brands from the 63 Verified Client Roster. Case studies anonymised under NDA.
Representative engagements across the global delivery footprint. Client names withheld under NDA.
A major refining client required a 5-year HAZOP refresh on CDU + VDU units, with LOPA-driven SIL recommendations rolled into the SIS upgrade scope. OISD-118 alignment with full node-by-node revalidation.
Client name withheld · representative of multiple engagements in this category
A hyperscale operator required arc flash hazard analysis across a 14 MW campus, with NFPA 70E (2024) compliant warning labels printed and installed. IEEE 1584-2018 calculations validated against ETAP model.
Client name withheld · representative of multiple engagements in this category
A GCC pharma campus engaged the 5-year AMC retainer covering annual HAZOP refresh, arc flash recalculation under load growth, SIL recertification, OISD-equivalent safety audit support, and on-call Chartered Engineer access for incident response.
Client name withheld · representative of multiple engagements in this category
Annual HAZOP refresh, arc flash recalculation when load grows above 8% or topology changes, SIL recertification at year 3, OISD / PESO / OSHA audit support, on-call Chartered Engineer access for incident response (24-hour SLA), and pre-startup safety review chairing for any in-period brownfield modification.
IEEE 1584-2018 for arc flash incident energy calculation, NFPA 70E (2024) for the workplace electrical safety requirements and warning label format, IS 13234 for India statutory equivalent, and IEC 61482 for arc-rated PPE selection. Calculations validated against the ETAP power system model.
Yes. India HAZOPs chaired by a staff CEng MIE India. US OSHA PSM Process Hazard Analyses chaired through the Houston entity by a PE-credentialed safety lead. International (GCC + EU + AUS) engagements chaired by a CEng who carries the equivalent local recognition.
IEC 61511 (process sector) + IEC 61508 (electronic / electrical / programmable electronic safety systems). LOPA is the primary SIL determination methodology, with risk graph as a screening tool. Fault tree analysis for SIL-3 systems and above.
Yes. OISD-118 (process plant safety), OISD-145 (Hazard Identification and Risk Analysis), OISD-153 (emergency response), PESO Petroleum Rules 2002, OSHA 1910.119 PSM, EPA RMP, and Factories Act statutory inspections are all in scope. Audit support is the most-used line item in the 5-year AMC retainer.
Single-unit HAZOP: 3 to 5 weeks. Full plant HAZOP refresh: 6 to 10 weeks. Arc flash study: 4 to 8 weeks. QRA: 6 to 10 weeks. LOPA + SIL: 4 to 6 weeks. Safety audit: 2 to 4 weeks. 5-year AMC retainer: 60 months with quarterly cadence reviews.
Yes. The 5-year AMC retainer is a fixed annual fee covering all routine deliverables (HAZOP refresh, arc flash recalc, SIL recert, audit support). Out-of-scope incident response or brownfield modification PSSR work is invoiced separately at retainer-discounted day rates.
Yes. The practice runs an integrated bench. HAZOP, QRA, LOPA and SIL on the process side. Arc flash, short-circuit, protection coordination and NFPA 70E / IS 13234 on the electrical side. Same Chartered Engineer leadership across both for refineries, pharma and data centres where the two regimes overlap.
This Service Hub is country-neutral. For India statutory CEng MIE deliverables or US PE-stamped deliverables, the country variants carry the full local stack.
Tell us the asset, the audit cycle, and whether you need a one-shot study or a 5-year retainer. We respond within one working day with a scope, fee envelope, and the right country-team handoff plan.