Fabrication-ready isometrics generated from LiDAR + verified P&ID line list.
Every spool, every weld, every fitting · captured in survey-grade LiDAR, extracted into ISO 6428-compliant isometric drawings, ready for fabrication shop or replacement-in-kind. 3,000+ km of piping has flowed through this pipeline for refineries, petrochem plants, and pharma sites in our roster.
When a flange leaks, an elbow corrodes, or a pipe support fails · you need the isometric. The original construction isometrics are missing 30-50% of the time in brownfield plants. The MOC modifications are rarely documented. Field measurement + redraw takes 3-6 weeks · time your shutdown can't afford. We rebuild your isometric set from LiDAR · every line, every spool, ASME B31.3-compliant, fabrication-ready, indexed to your line list. Next time something fails, the isometric is in the file.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the As-Built Engineering practice lead within 24 hours.
Point cloud classified by line. Reconciled against P&ID line list (updated or legacy). Each line has a tag, service, design pressure / temperature, MOC.
Automated spool extraction from point cloud · pipe segments, elbows, tees, reducers, flanges, valves identified geometrically + verified by manual QC.
ISO 6428 + ASME B31.3 + ISO 4067 compliant isometrics generated. North arrow, sheet boundaries, BOM, weld map, support locations all per your site standard.
Automated BOM extraction · pipe size + schedule + MOC + flanges + fittings + valves + supports. Material take-offs ready for procurement.
Output in DWG / DXF / PDF / IFC. Linked to line list, P&ID, and 3D model. CEng MIE-signed for fabrication release.
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three anonymised engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
Rebuilt 240 km of piping isometrics for crude distillation unit. Avoided 6-week turnaround prep delay. Fabrication-shop-ready output.
1,800 MOC modifications were on field redlines but never on isometrics. Closed the backlog in 14 weeks.
USP-grade pharma utility piping. Isometrics validated per GMP commissioning protocol.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.