As-Built Engineering

Loop Drawing Reconstruction

Process flow diagrams verified against LiDAR scan and field reality.

Your P&IDs are 15 years out of date. Half the modifications were redlined on paper that's now lost. We rebuild them from LiDAR + field verification + DCS extraction · delivered in SmartPlant, AVEVA P&ID, or AutoCAD Plant 3D native format, ready for your next turnaround.

25 marquee operators · 21 countries · verified roster
Bayer · Pfizer · TATA · Adani · JSW · ISRO · Siemens · Bosch · DuPont · Mahindra · Hindalco · and others
Bayer
Pfizer
TATA
Adani
JSW
Nestle
ISRO
Mahindra
Siemens
Bosch
DuPont
Aditya Birla
Hindalco
Amazon
Indian Oil
ITC
Asian Paints
Dr. Reddy
Kia
Bureau Veritas
Lloyd
Halliburton
Jindal Steel
AMNS
Rolls Royce
Bayer
Pfizer
TATA
Adani
JSW
Nestle
ISRO
Mahindra
Siemens
Bosch
DuPont
Aditya Birla
Hindalco
Amazon
Indian Oil
ITC
Asian Paints
Dr. Reddy
Kia
Bureau Veritas
Lloyd
Halliburton
Jindal Steel
AMNS
Rolls Royce
Why this matters

Why 90% of brownfield P&IDs are wrong, and what that costs

Every brownfield plant has the same problem · the P&IDs in the engineering vault are not the P&IDs that reflect the plant. Over years, modifications get made under MOC, redlined on print copies, sometimes formalised, often not. The result: 60-90% of P&IDs have errors. Turnaround planning, HAZOP, SIL, and digital twin programmes all inherit the errors. We rebuild P&IDs to match field reality · LiDAR-verified piping connectivity, field-verified instrumentation, DCS-extracted control loops. The output is ISA S5.1 + IEC 60848 compliant, sign-off ready, and the foundation for everything downstream.

Method

How we deliver Loop Drawing Reconstruction

CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the As-Built Engineering practice lead within 24 hours.

01

Source consolidation

Existing P&ID set + plot plan + DCS / SCADA exports + LiDAR scan all loaded. Discrepancies pre-flagged for field check.

02

Field verification walkdown

Engineer-led walkdown verifying line connectivity, equipment present, instrumentation tag, control loop assignment. Marked up on consolidated source.

03

P&ID rebuild

P&IDs redrawn in SmartPlant (Intergraph / Hexagon), AVEVA P&ID, AutoCAD Plant 3D, or Bentley OpenPlant. Symbology per ISA S5.1 + your site standard.

04

Sign-off review

Internal QC + cross-check against HAZOP nodes + handover review with your operations + maintenance team.

05

Native handover

Delivered in your native format · SmartPlant, AVEVA, AutoCAD Plant 3D, IFC. Output also includes a CSV line list, equipment list, and instrument index.

Standards + compliance

Built to the standards your auditors quote

Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).

Anonymous case anchors

What this looks like in production

Three anonymised engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.

Refinery, India · turnaround prep

Updated 1,400 P&IDs in 16 weeks pre-turnaround. HAZOP refresh ran on verified P&IDs · 8 high-severity findings closed before TAR start.

Pharma, USA · GMP validation

Cleanroom + utility P&IDs rebuilt for FDA pre-approval inspection. Validated as-built documentation chain.

Petrochem, Singapore · digital twin foundation

P&ID as-built layer for digital twin. Native AVEVA P&ID handover with 100% link to physical asset register.

Frequently asked

Loop Drawing Reconstruction · the practical questions

Do you need access to our DCS / SCADA?
Helpful but not strict. DCS / SCADA exports give us control loop verification at speed. If access isn't available, we field-verify loops · slower but achievable.
What's the typical accuracy improvement?
From a 25-40% error rate in legacy P&IDs to < 1% error rate at handover. Annual update cycle keeps it at < 2% indefinitely.
Can you do partial scope (only critical units)?
Yes · we routinely deliver unit-by-unit. Most clients start with their highest-risk unit (Crude Distillation, Hydrocracker, FCC) and roll out.
How do P&IDs link to HAZOP?
Directly · the HAZOP node structure should derive from P&ID boundaries. Updated P&IDs trigger HAZOP refresh on the changed nodes only · ~30% of the HAZOP cost of starting fresh.
Do you integrate with our MOC process going forward?
Yes · we deliver a P&ID-MOC integration protocol so future modifications flow into the P&IDs in real time, not on annual cleanup cycle. Critical for keeping the foundation accurate.

Scope your Loop Drawing Reconstruction engagement.

Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.

  • 4 fields. No phone interview to start.
  • Per-discipline routing to the As-Built Engineering practice lead.
  • Anonymous case anchors sent with first reply.
  • Same-day callback for deadline-driven enquiries.

As-Built Engineering Scoping

P&ID + Iso + SLD + GA · LiDAR-powered · routes to As-Built Practice.