Verified single-line diagrams · the foundation for every power system study.
Your single-line diagram is the foundation for load flow, short circuit, arc flash, protection coordination · everything PSS. If it's wrong, every study downstream inherits the gap. We rebuild it from LiDAR + tag verification + DCS extraction · IEEE 315 / IEC 60617 compliant, ETAP / DigSILENT-native, ready to drive studies.
Plant electrical systems evolve · new feeders, new transformers, breaker replacements, capacitor bank additions. The SLD on the wall hasn't tracked. Every PSS study (load flow, short circuit, arc flash) we do starts with an SLD audit · we find an average 22% discrepancy between the SLD-as-marketed and the SLD-as-installed. Updating the SLD as a precondition makes every downstream study 30-50% faster and 100% more credible. We deliver it ETAP / DigSILENT-native so the PSS study can start the day after sign-off.
CEng MIE India-signed deliverables · LiDAR-powered where applicable · digital twin handover ready · routes to the As-Built Engineering practice lead within 24 hours.
Existing SLD + electrical drawings + protection settings + MCC schedules consolidated. Discrepancies flagged for field check.
Substation, MCC, MV switchgear walkdown · cable tag verification, breaker rating capture, protection device inventory. LiDAR point cloud cross-references panel locations.
Drawn in your native CAD environment (AutoCAD Electrical, AVEVA, Bentley) or directly into the PSS modelling environment (ETAP / DigSILENT).
ETAP or DigSILENT model built from the verified SLD · ready for load flow / short circuit / coordination / arc flash. Drawing pack and model handed over together.
CEng MIE-signed. Governance protocol delivered for keeping it current.
Reports reference the international and national standards your regulators, F500 audit teams, and corporate process safety leads cite. Every deliverable signed by a Chartered Engineer (CEng MIE India).
Three anonymised engagements from our verified roster · quantified outcomes, no client names disclosed without written permission.
22% discrepancy found in legacy SLD vs field. SLD rebuilt + ETAP-loaded · PSS suite delivered 8 weeks faster than baseline.
SLD updated + cross-referenced to cleanroom equipment register. Audit-ready electrical drawing chain.
12 substations updated to consistent SLD standard. Replaced 18-year-old drawings · digital twin electrical layer foundation.
Tell us your plant, region, and scope · a named Chartered Engineer responds within 24 hours.